Services

New construction installs

Framed opening, housewrap, nailing fin, shims, and a unit that is plumb before the siding crew shows up.

AI-generated imagery — not an actual Clearview job or job site

The part that decides whether it leaks

Lap order at the opening.

A set window looks the same from the street whether or not it was flashed in the right sequence. It does not stay that way. Here is the order we work in, every time.

Housewrap laps over the head4321Water is handed downward at every lap
  1. Sill pan firstA pan or pan flashing goes in before the window, sloped out, with the back dam turned up.
  2. Window set into the panShimmed plumb and square, fins landing flat on the sheathing. Never caulk the sill fin closed.
  3. Jamb flashing over the finsSides go on next, lapping over the sill flashing so any water is handed downward.
  4. Head flashing lastThe head laps over the jambs, and the housewrap laps over the head. Shingle order, top over bottom.

What we set

Fins, shims, and a plumb unit.

New-construction vinyl and fiberglass with nailing fins, sized to the rough opening. We flash the sill, set the unit, and leave you ready for wrap and cladding.

How it runs

Confirm openings, confirm lead time, then a scheduled set — not a surprise on a framing day. Tell us if you are the GC or the owner so the quote is written for the right person.

Bring to the first call

  • Plan or opening schedule
  • Window style and finish
  • Target set date
  • Who is buying: builder or owner

Ask for a reference on a build we set this season.

From a framed job

Set, flashed, and out of the siding crew’s way.

Nailing fins taped into the weather barrier, sill flashed, unit plumb. This is what we hand back to the builder.

Windows set and flashed in a sheathed two-story new build, taped seams, before siding
Set and flashed, ready for sidingnew construction

Next step

Tell us the opening schedule.

Send the plan or the opening count and we will come back with a set date and a written estimate.